We appear to have this shift down. Brad was already nearly finished with re-purposing a package when I got in at 1 p.m.
We had 2 VSOTs and 1 VO ready to go not too long after that. Each of us took a VSOT and I did the VO plus the script for the 3pm update. We had all of it done by 4pm. That meant that Gretchen only had one VSOT and the video to put in for her shift.
I was also able to do the coding for the links without having to refer to my notebook. Repetition is a great thing! And I've gotten pretty good at manipulating/sizing images in Photoshop. Both of these are skills that I was hoping to obtain by taking this class-- so as far as those are concerned-- mission accomplished.